PREDICTIVE ANALYTICS IN PROJECT MANAGEMENT: EVALUATING ITS ROLE IN COST CONTROL, SCHEDULE OPTIMIZATION, AND RISK MANAGEMENT  

Authors

  • Zark Khan MSc International Business ft. Project Management (UK) University of Huddersfield, United Kingdom Author

DOI:

https://doi.org/10.68156/46sjss47

Keywords:

Cost Control, Lahore, Machine Learning, Predictive Analytics, Project Management, Risk Management, Schedule Optimization

Abstract

Abstract

Predictive analytics is becoming an important capability in project management because it enables organizations to forecast potential problems, improve resource allocation, and make evidence-based decisions. Nevertheless, cost overruns, schedule delays, and inadequate risk anticipation continue to challenge project delivery, particularly where project data are fragmented and analytical capabilities are limited. This study examines the perceived role of predictive analytics in cost control, schedule optimization, and risk management among project management professionals in Lahore, Pakistan. Drawing on the Technology–Organization–Environment framework and the project management literature, the study proposes a quantitative, cross-sectional survey of project managers, engineers, planning professionals, and project coordinators working across construction, information technology, manufacturing, and service sectors. A structured questionnaire measures predictive analytics adoption, perceived forecasting accuracy, cost-control effectiveness, schedule performance, risk identification, and organizational readiness. The proposed analysis uses descriptive statistics, reliability testing, correlation, and multiple regression to examine the relationships between predictive analytics adoption and project management outcomes. Existing research indicates that machine learning and data-driven forecasting can support cost estimation, schedule prediction, and risk assessment, although effectiveness depends on data quality, model validation, and implementation conditions (Lagos et al., 2024; Moussa et al., 2024; Talgata, 2023). The study is designed to generate context-specific evidence concerning analytical adoption in Lahore. Its anticipated practical contribution is a framework for integrating predictive tools into routine project monitoring, enabling earlier intervention, more informed resource allocation, and improved project governance. Actual empirical conclusions will require analysis of collected survey responses.

 

References

A qualitative study on artificial intelligence and its impact on the project schedule, cost and risk management knowledge areas as presented in PMBOK®. (2023). Applied Sciences, 13(19), Article 11081. https://doi.org/10.3390/app131911081

Al-Ayed, S. (2025). The role of artificial intelligence in project management performance: The mediating effects of competence retention and top management support. Journal of Project Management. https://doi.org/10.5267/j.jpm.2025.3.005

Almahameed, B. A., & Bisharah, M. (2024). Applying machine learning and particle swarm optimisation for predictive modelling and cost optimisation in construction project management. Asian Journal of Civil Engineering. https://doi.org/10.1007/s42107-023-00843-7

Arabiat, A., Al-Bdour, H., & Bisharah, M. (2023). Predicting the construction projects time and cost overruns using K-nearest neighbor and artificial neural network. Asian Journal of Civil Engineering. https://doi.org/10.1007/s42107-023-00649-7

Ashtari, M. A., Ansari, R., Hassannayebi, E., & Jeong, J. (2022). Cost overrun risk assessment and prediction in construction projects: A Bayesian network classifier approach. Buildings, 12(10), Article 1660. https://doi.org/10.3390/buildings12101660

Bento, S., Pereira, L., Gonçalves, R., Dias, Á., & da Costa, R. L. (2022). Artificial intelligence in project management: Systematic literature review. International Journal of Technology Intelligence and Planning, 13(2), 143–163. https://doi.org/10.1504/IJTIP.2022.126841

Darko, R. B. O., Mensah, G. R., & Fawehinmi, Y. O. (2026). Industry specific framework for artificial intelligence adoption in project risk, cost and schedule management. Journal of Economics, Management and Trade, 32(7), 51–77. https://doi.org/10.9734/jemt/2026/v32i71447

Datta, S. D., Islam, M., Sobuz, M. H. R., Ahmed, S., & Kar, M. (2024). Artificial intelligence and machine learning applications in the project lifecycle of the construction industry: A comprehensive review. Heliyon, 10(5), Article e26888. https://doi.org/10.1016/j.heliyon.2024.e26888

Gao, Y., Antwi-Afari, M. F., Huang, Y., Chen, Z.-S., & Manzoor, B. (2026). Artificial intelligence in construction project management: A systematic literature review of cost, time, and safety management. Buildings, 16(5), Article 1061. https://doi.org/10.3390/buildings16051061

Gondia, A., Siam, A., El-Dakhakhni, W., & Nassar, A. H. (2020). Machine learning algorithms for construction projects delay risk prediction. Journal of Construction Engineering and Management. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001736

Hamdan, M. M., Thneibat, M., & Hyari, K. (2025). Predicting cost overrun in construction projects using machine learning algorithms: The case of Jordan. Engineering, Construction and Architectural Management. https://doi.org/10.1108/ECAM-09-2024-1209

Karadimos, P., & Anthopoulos, L. (2024). A taxonomy of machine learning techniques for construction cost estimation. Innovative Infrastructure Solutions, 9, Article 420. https://doi.org/10.1007/s41062-024-01705-0

Lagos, C. I., Herrera, R. F., Mac Cawley, A. F., & Alarcón, L. F. (2024). Predicting construction schedule performance with last planner system and machine learning. Automation in Construction, 167, Article 105716. https://doi.org/10.1016/j.autcon.2024.105716

Moussa, A., Ezzeldin, M., & El-Dakhakhni, W. (2024). Predicting and managing risk interactions and systemic risks in infrastructure projects using machine learning. Automation in Construction, 168, Article 105836. https://doi.org/10.1016/j.autcon.2024.105836

Narbaev, T., Hazır, Ö., Khamitova, B., & Talgat, S. (2024). A machine learning study to improve the reliability of project cost estimates. International Journal of Production Research. https://doi.org/10.1080/00207543.2023.2262051

Nenni, M. E., De Felice, F., de Luca, C., & Forcina, A. (2025). How artificial intelligence will transform project management in the age of digitisation: A systematic literature review. Management Review Quarterly. https://doi.org/10.1007/s11301-024-00418-z

Sadeghi, S. (2026). Machine learning-enabled construction project management: Systematic review, comparative performance synthesis and implementation framework. Built Environment Project and Asset Management, 16(3), 461–483. https://doi.org/10.1108/BEPAM-11-2024-0264

Sadikoglu, E., & Demirkesen, S. (2025). Review of machine learning and artificial intelligence use for cost estimation in construction projects. Proceedings of the European Conference on Computing in Construction. https://doi.org/10.35490/EC3.2025.363

Talgata, S. (2023). A machine learning study to improve the reliability of project cost estimates. International Journal of Production Research. https://doi.org/10.1080/00207543.2023.2262051

Tian, K., Zhu, Z., Mbachu, J., Ghanbaripour, A., & Moorhead, M. (2025). Artificial intelligence in risk management within the realm of construction projects: A bibliometric analysis and systematic literature review. Journal of Innovation & Knowledge, 10(3), Article 100711. https://doi.org/10.1016/j.jik.2025.100711

Tornatzky, L. G., & Fleischer, M. (1990). The processes of technological innovation. Lexington Books.

Turkyilmaz, A. H., & Polat, G. (2024). Risk-based completion cost overrun ratio estimation in construction projects using machine learning classification algorithms: A case study. Buildings, 14(11), Article 3541. https://doi.org/10.3390/buildings14113541

Unisa, Z. A., & Nenzhelele, T. E. (2026). Artificial intelligence-based predictive analytics in project management: A concept-centric systematic literature review. International Journal of Applied Research in Business and Management. https://doi.org/10.51137/wrp.ijarbm.629

Published

2026-07-31

How to Cite

PREDICTIVE ANALYTICS IN PROJECT MANAGEMENT: EVALUATING ITS ROLE IN COST CONTROL, SCHEDULE OPTIMIZATION, AND RISK MANAGEMENT  . (2026). Insights (Bhalwal) International Journal of Humanities, Management, and Social Sciences, 3(4), 34-53. https://doi.org/10.68156/46sjss47